PROJECTS
Multi-Purpose Buildings
Temporary Bus Depot - MOASALAT (World Cup)
Client: Ashgal
Contract Value (QAR): 150,000,000.00
Date Completed: December 2022
Successfully completed three temporary bus depot projects in different locations during the World Cup event. We provided end-to-end electrical packages for each project, from design stage to handover and operation.
Mechanical Scopes
- Cooling system with total number of 32 AHU, 6 FAHU, 12 PU &2414 A/C wall mounted type.
- For ventilation equipment: exhaust, fresh & smoke ventilation with a total number of 868
- Firefighting sprinkler systems with 3 sets of fire pump (500 GPM), automatic fire extinguishers (4 rooms), FM200 system (18 rooms) &fire suppression system for kitchen hood (3 rooms).
- LPG SYSTEMS through total of 3 plants rooms in, each in a site.
- Fuel system in different sites location through 5 plant rooms, with capacity of ___
Electrical Scopes
- infrastructure for 15 Package substations, 6 indoor substations with the Total Load of 12 MW, 6 generators, 53 SMDBs, and 117 DBs.
- Installed the CCTV system for 1260 cameras, including fiber optics, Cat 6 A cables, pole installations, media converters, industrial switches, and switches.
- Provided an external lighting system, including high mast, light poles, and feeder pillars.
- Installed all ELV systems, such as ACS, Fire Alarm, Public address for 3 Mosques, and BMS System. Our team’s expertise and dedication made these projects a success, providing essential infrastructure to support the World Cup event.
Regeneration of Tarek Bin Ziyad School
Client: Private Engineering Office
Contract Value (QAR): 41,000,000.00
Date Completed: September 2016
TBZ Description.
Mechanical Scopes
- Cooling VRV system with total number of 30 AHU, 1 FAHU & 78 VAV
- For ventilation equipment: exhaust, fresh & smoke ventilation with a total number of 51
- Firefighting sprinkler systems with 1 set of fire pump (500 GPM), FOAM SYSTEM (1 room), FM200 system (3 rooms) .
Electrical Scopes
- Major electrical & power systems
- Major ELV systems including the most recent & complicated technologies in AV system
Design and Build for the Modification and Additional Works to Existing (27) Schools – Package Three (11) Nos. Schools
Client: ASHGHAL
Contract Value (QAR): 34,367,559.88
Date Completed: June, 2022
I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
4 New Schools Stage 2 Package 9
Client: ASHGHAL
Contract Value (QAR): 26,500,000.00
Date Completed: July 24, 2016
I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Design and Build for the Modification and Additional Works to Existing (27) Schools – Package 1& 2 (5 Nos. of Schools)
Client: ASHGHAL
Contract Value (QAR): 12,650,000.00
Date Completed: June, 2022
I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Construction (2) Nos. Kindergarten, Site 21 & 29
Client: ASHGHAL
Contract Value (QAR): 11,460,000.00
Date Completed: February 23, 2009
I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
5 + 2 New Kindergarten
Client: ASHGHAL
Contract Value (QAR): 15,982,000.00
Date Completed: June 15, 2015
I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Qatar Leadership Academy
Client: Qatar Foundation
Contract Value (QAR): 5,100,000.00
Date Completed: October 5, 2005
I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Al Ghuwairiya Boys Elementary Preparatory and Secondary School
Client: Ministry of Municipal Affairs Building Eng. Dept.
Contract Value (QAR): 4,003,424.00
Date Completed: October 31, 2003