Educational Buildings
New College of Law Building
Client: Qatar University
Completion Date: December 2020
The New College of Law Building is constructed to accommodate 2,000 students and 100 staff over a built-up area of 50,954 sqm (B1, GF+3).
Mechanical Scopes
- ETS room with cooling capacity of 1480 TR & a total of 36 AHU, 7 FAHU & 16 HRU & 401 Fan Powered units.
- Ventilation equipment: 129 smoke ventilation & pressurization fans.
- High technology for packaged grey water system with capacity of 14 mᶟ/day.
- Firefighting systems with 1000 GPM fire pumps & 32 FM200 rooms.
- Lifting stations with total capacity of 71 l/s.
Electrical Scopes
- Switchgear Package:3 LV panels, 44 SMDB’s, 16 MCC & 300 DB’s with TCL 4,796 KW
- AV package including 3 video walls, interactive screens, digital signage, room booking, laser projectors and array speakers for auditorium.
- ICT System with the 60 IDF racks, 2 MDF’s racks for 7,000 Data Outlets.
- Seamless integration of CCTV System, Access Control, Public Address, Master Clock and BMS systems with existing Qatar University systems.
- Dali Lighting control system fully integrated with lights, curtains, AV system.
- Installation, T&C of Fire Alarm system with 20 loops & 19 power circuits.
Design and Build for the Modification Works– Package Three (11+2) Schools
Client: ASHGHAL
Completion Date: June, 2022
The scope work covers the design, construction, completion and commissioning of additional classrooms buildings, fire life safety code compliance upgrade and modification works to existing (11Nos + 2 Nos) school buildings located in Qatar.
Mechanical Scopes
- VRF systems with total of 130 outdoor units, 32 AHUs, 25 indoor units.
- For ventilation equipment: Ventilation fans with a total number of 136 fans.
Electrical Scopes
- Lighting and Power systems, Emergency and Exit Light System, Lightning protection system.
- Wired & wireless fire alarm detection system.
- Delivered the Building Management System (BMS) with all required integration with Mechanical and Electrical systems including seamless integration with the existing systems.
- Modifications to the existing LV panel (13 Nos) including the delivery of new switchgear (38 DBs, 13 SMDBs, and 25 MCCs) to suit the purpose of the newly constructed building all during the operational hours of the existing schools.
Design and Build for the Modification Works – Package 1& 2 (5 Schools)
Client: ASHGHAL
Completion Date: June, 2022
The scope of work covers the design, construction, completion and commissioning of additional classrooms building, fire life safety code compliance upgrade and modification works to existing (5 Nos) school buildings located in Qatar.
Mechanical Scopes
- VRF systems with total number of 57 Outdoor units, 10 AHUs, 10 indoor units.
- For ventilation equipment: ventilation fans with a total number of 31 fans.
Electrical Scopes
- Lighting and power systems, Emergency and Exit Light System, Lightning protection system.
- Wired fire alarm detection system.
- Delivered the Building management system with all required integration with Mechanical and Electrical systems including seamless integration with the existing systems.
- Modifications to the existing LV panel (5 No’s ) including the delivery of new switchgear (10 DB’s ,5 SMDB’s, and 5 MCC’s) to suit the purpose of the newly constructed building all during the operational hours of the existing schools.
4 New Schools Stage 2 Package 9
Client: ASHGHAL
Completion Date: July 2016
Construction of 4 new schools (G+1) in different locations, with a total built up area of 13,107.56 m² each.
Mechanical Scopes
- Packaged cooling units with total number of 104 units to deliver 2,320 TR cooling capacity.
- For ventilation equipment: Ventilation fans with a total number of 84 fans.
- Firefighting pump station with a capacity of 100 GPM for each school.
- 31,000 gallons tanks were installed for every school & 7 domestic pumps in addition to multiple water heaters.
- Every school is equipped with 9 drinking water fountain stations with best water filtration to secure a healthy drinking water.
5 + 2 New Kindergarten
Client: ASHGHAL
Completion Date: June 2015
The project consists of 7 typical kindergartens in multiple locations within the state of Qatar (Meaither, Baya, Al Hilal, Dahl Al Hamam, Lughairiya & Al Shamal).
Mechanical Scopes
- The cooling load is 1,470.3 tr delivered though 98 DX package units, all controlled & monitored through BMS system.
- 100 GPM firefighting pump was installed to comply with the requirements of the NFPA & QCD in each kindergarten.
- 3200 gallons tanks were installed for every kindergarten & 4 domestic pumps in addition to multiple water heaters and special type of sanitary ware to give the kids the most comfortable environment.
- Every kindergarten is equipped with 4 drinking water fountain stations with best water filtration to secure a healthy drinking water.
Construction (2) Nos. Kindergarten, Site 21 & 29
Client: ASHGHAL
Completion Date: February 2009
Mechanical Scopes
- Cooling system with total number of 14 package units.
- For ventilation equipment: exhaust, fresh with a total number of 16 fans.
Firefighting sprinkler systems with 2 set of fire pump (100 GPM).