PROJECTS

Iconic Projects

Emiri Terminal

Client: Private Engineering Office
Completion Date: September 2022

The extension of the Emiri Terminal at Hamad International Airport is a prestigious and delicate project at the level of the state of Qatar due to the sensitivity of security and safety protocols applied.

We are honored to be approved to execute Mechanical & Electrical works at the terminal that accommodates ceremonial reception and departure of guest of state, and that is a private terminal for H.H the Emir, his family and selected ministers. This terminal has been also used as the gate of the VVIP guests during the FIFA World Cup Qatar 2022.

The new terminal is conditioned with 653TR cooling capacity, with all the necessary installations of switchgear. Sprinklers firefighting system are installed in line with the requirements and considering the luxury’s architectural concepts in the project in addition to FM200 rooms. More than 4,000 tunable light fixtures have installed addressing the requirements of all the concerned authorities and specially Qatar Media Corporation. All these lights are connected to the Central Battery System, not emergency and exit only, due to the nature of the project.

Special AV system suiting the requirements of VVIP visiting that terminal with all the other supported ELV systems; not limited to WIFI, structure cabling, Tetra, in addition to the security systems (FA, CCTV, ACS) complying to the authorities and end user in addition to special UPS system to back up the power of all the ELV systems in addition to all the normal power sockets in the terminal.

All the above system are monitored and controlled through BMS system which is already integrated to the existing BMS system installed in the airport seamlessly as well as all the other ELV systems.

Regeneration of Tarek Bin Ziyad School

Client: Private Engineering Office
Completion Date: September 2016

We are honored we have completed the MEP works of the “Regeneration of Tarek Bin Ziad School” project, that was launched through a huge opening ceremony attended by HH Sheikh Hamad bin Khalifa  Al Thani. This historic school whom the Father Amir attended back in 1970 had been renewed under the umbrella of Qatar Foundation whilst retaining its original spirit and identity.

Our company has successfully completed multiple MEP scopes for Tariq Bin Ziyad project. For the mechanical we installed a Cooling VRV system with total number of 30 AHU, 1 FAHU & 78 VAV along with various ventilation equipment. In addition to Firefighting sprinkler systems with 1 set of fire pump and various clean agent systems.

As for the electrical we installed top-of-the-line electrical systems. Our skilled team completed the installation of switchgear work, generators, LV panels, transformers, MV panels to ensure the highest level of power reliability and stability. We also installed ELV System including CCTV, ACS, Structured cabling, Data, Telephone, WIFI, IPTV, PA, Clock system, light fitting and central battery system, small power, isolators, earthing and lightning protection system. In addition, a building management system (BMS) was implemented to control all MEP services, including exhaust fans, and fresh fans.

Qatar National Archive

Client: Private Engineering Office
Completion Date: September 2022

We are proud we have been part of the Design & Build of ID Works for the prestigious historical building of Qatar National Archives. This landmark building, located in Msheireb Downtown Doha over a built-up area 6769 m2, that is a piece of Art at the level of its architecture and interior spaces.

The building used innovative design techniques and unusual finishing practices for the cornerstone project of what may be the world’s largest LEED-certified community.

For this project, we have successfully delivered high-quality Mechanical installations not limited to multiple VAV boxes that were thoroughly installed to complement the contemporary design of the ceiling. in addition. to installation of clean agent rooms to protect the items stored.

We successfully delivered various of electrical systems which we integrated with the existing system in MSHEIREB further to upgrading the electrical switch gear and central battery system to accommodate the additional mechanical equipment and emergency lights installed in extension area. Special lighting control system was installed for more than 2,500 points to give the required legacy to the building. For the importance of this project and the significant value of items to be stored, all the ICT works- not limited to racks cables- had been connected & integrated with the ICT system installed in Emiri Diwan.

At our company, we prioritize delivering high-quality electrical installations that meet our client’s unique needs, and we are proud to have delivered these exceptional systems for the new QNA.